Advanced ROV simulations and ROV training simulator for effective operator training

In addition to the design and delivery of the Joseph Plateau fall pipe ROV, Seatools developed and delivered a segment of a full-mission subsea rock installation simulator. The simulator can imitate a full-fledged rock installation operation – including the installation of the pipe-handling system and the subsea rock installation process controlled by the Joseph Plateau fall pipe ROV.

Continue to the Advanced simulations and control engineering solution page

Joseph Plateau FPROV - ROV control system simulations and training simulator

    Fields marked with * are required for filling in.
    By selecting Submit, any information you provide to Seatools will be used in accordance with Seatools Privacy Policy.