Innovative tool for efficient anode cage installation operations

The installation of the anode cages constitutes an important element during the construction of the Hohe See Offshore Wind Farm. A crucial part of the operation, GeoSea contracted Seatools for the design and delivery of an anode cage installation tool.

This tool facilitates highly automated installation operations and allows GeoSea to achieve significant time savings – a critical parameter when performing capital-intensive offshore installation operations. A comprehensive set of sensors enables the monitoring of the installation procedure every step of the way, and contributes to a fully autonomous operation, obviating the need for ROVs or divers. The delivered solution proves to be highly successful: GeoSea performs cost-effective installation operations thanks to the ACIA tool.

Continue to the Offshore and subsea installation solution page

Subsea tool-for-anode-cage-installation-offshore-wind-farms

    Fields marked with * are required for filling in.
    By selecting Submit, any information you provide to Seatools will be used in accordance with Seatools Privacy Policy.