Highly redundant fall pipe ROV for predictable SRI operations

For the newly built fall pipe and mining vessel Joseph Plateau, our client Jan de Nul requested a fall pipe ROV. During the ROV’s development, one of the dominant design criteria was overall system reliability.

Seatools designed and built a highly redundant ROV architecture that incorporates two equal, full-fledged hydraulic systems. The setup, combined with full DP capabilities, enables Jan de Nul to perform highly predictable rock installation operations.

Continue to the Subsea Rock Installation solution page

Joseph Plateau FPROV - ROV control system simulations and training simulator

    Fields marked with * are required for filling in.
    By selecting Submit, any information you provide to Seatools will be used in accordance with Seatools Privacy Policy.