For the newly built fall pipe and mining vessel Joseph Plateau, our client Jan de Nul requested a fall pipe ROV. During the ROV’s development, one of the dominant design criteria was overall system reliability.
Seatools designed and built a highly redundant ROV architecture that incorporates two equal, full-fledged hydraulic systems. The setup, combined with full DP capabilities, enables Jan de Nul to perform highly predictable rock installation operations.