Retrofit AHC LARS – From passively to actively heave-compensated LARS in 7 weeks
On behalf of Deepocean, and in cooperation with Osbit Power, a passively compensated LARS was upgraded to a combined actively and passively heave-compensated LARS system used to deploy a subsea plough.
By means of using our standardized HeaveMate® package in combination with the performance of in-depth simulations for virtual testing and pre-programming of the controller, Seatools was able to comply with the highly challenging delivery time of only 7 weeks, which included commissioning and testing.